Want to join Toile on a tour of the Mr. Toilet House?
  Under Construction (But, you can see) admin ¤Ó 2018-10-09 ¤Ó 904  

In order to provide a better viewing environment for visitors at Haewoojae,
The exterior wall of the museum is being repaired and the central restroom inside the museum is being remodeled.
The construction is scheduled for October 12th.

And we apologize for the inconvenience caused by the noise and paint odor.
You can visit both the Haewoojae Museum and the Culture Center.
Thank you.

031-271-9777

 
FILE
 
LIST
  • 463 Jangan-ro, Jangan-gu, Suwon(Imok-dong), Korea 16209
  • TEL : 031)271-9777
  • FAX : 031)271-9776
  • E-MAIL : mrtoilet@haewoojae.com